Completed ERS underground pipe repair visible before the excavation was closed ERS / FIELD RECORD

06 / Urgent repair

BURST PIPE EXCAVATION AND REPAIR.

The failed underground section was exposed, repaired and checked before the area was closed.

Burst pipe excavation and repair
ERS / COMPLETED FIELD RECORD

Scope notes

What the record shows.

  1. 01

    Leak area located and isolated

  2. 02

    Failed section exposed with controlled excavation

  3. 03

    Repair tested before reinstatement